We’ve had some horrid cold weather and I spent two half days putting pink batts in our roof. It is a very low pitched roof so that one can’t get even onto hands and knees. I started by laying a nice smooth plankway the full length over the kitchen and sittingroom so that I could slide on my back hauling myself along on the roof trusses. Then I retired to the far end with a rope and X fed bundles of batts into the roof attached to the other end, with a second rope to haul the cover back for more. Then it was just a question of poking them into position with a broom – but my elbows and hipbones got a bit sore! I don’t know whether it’s improved the ceiling but it had a marvellous effect on the weather. It was almost balmy when we went for a Sunday walk this afternoon.
I’m sorry you are still having trouble with aspects of the flat e.g. those windows and beetles but I suppose it is one of the debit aspects of property-owning that one always does. I was under the trapdoor into the hole under the house a week or so ago and was horrified to find a large patch of bright yellow mould surrounded by reaching tentacles and clouds of white fibres, all sprouting within a foot or so of the wall. After 2 days I nerved myself to scoop the horrid stuff up in an ice cream carton and take it to the building inspector who (thankfully) dismissed it as harmless as mushrooms.
I’m so glad that the kitchen fan is a success. They certainly are expensive things. Ours was all the more because it wasn’t practical to put it in the kitchen wall or window since that faces the prevailing wind and the poor thing couldn’t be expected to cope with that, and if it did it would only blow the grease and smell back into the bathroom next door; so we put a pipe through the ceiling and straight up through the roof. Of course what with the plumber to cut the hole in the decromastic roof, and the carpenter to cut the hole in the ceiling, and the tinsmith to make up the pipe and the electrician to wire up the fan, the fitting cost about twice as much as the fan itself!
X’s new plan for household tidiness – no more cupboards for marmalade, empty yoghurt pots etc. You just have one shelf on which everything is put in chronological order, everything else being moved up to make room – and anything which gets to the other end is thrown away. We agreed an improvement whereby there would be a hole in the wall at the far end and one of those disposal bins parked outside so that the whole system would become automatic. Brilliant, n’est ce pas?

Poor X, he saw the enormous earth mover working next door and leapt out to get him to level our drive prior to concreting: at $50 an hour + an earth carrier lorry and man, he put in three-quarters of an hour and didn’t do the heaviest part, in fact I think it was a dead and expensive loss, but that’s what happens when one tries to supervise yourself and economise.
The main preoccupation this week is the start of the new room. I worked with our chosen one-man builder – mostly fetching three loads of sand in the trailer to fill in for height. By evening it was all prepared and the concrete ordered for the morning. Three minutes before the appointed hour the lorry arrived – but no builder! Panic – but, by the time he had backed up the drive and got a cup of coffee, he arrived so all was well again – until the last scrap of mix dribbled out with a miserable hole in one corner of the boxing. I think if I’d been on my own I would have raked it all across and levelled it off an inch or so lower! As it was we ordered another 1/2 yard, waited an hour and a half for it, and then had to fit half of it into the caravan standing – a very expensive sort of fill-material.
As I have now decided to do most of it myself [adding a new room] I am obviously going to be busy for a long time. X estimated it at 200 man hours or thereabouts – and you can bet that I don’t count as that sort of a man and will need quite a bit of extra time putting right the things that go wrong as I go along. X was a bit horrified when we started examining the carport in detail as the great 10 inch rafters which support its roof (and our new room on top) appear to be resting on only one inch of a beam at the house end of them and to be held in place largely with a couple of 6 inch nails each. So I must see if I can incorporate some slight reinforcement as I fill in the carport just to stop them all falling off and our new room with them if we have an earth tremor.
I was fortunate to get an off-cut of particle board the floor is made of, and replace the patch I cut out. Having measured it about four times to make sure I didn’t cut it wrong, as I so often do, I cut it wrong, would you believe, and had to fit in a strip a quarter of an inch wide to make up!